Planned Maintenance | CHG0032450 - SGS Data centre generator load test

Scheduled for Aug 11, 17:00 - 21:00 NZST

Scheduled

Atturra will be performing a four monthly generator load test to ensure that the data centre’s emergency power systems will function correctly during an actual building mains failure.
It is not envisaged that this test will affect customers, as the generator will supply power requirements during the test. Should the generator fail during the test period, UPS power will be provided while mains power is immediately restored.
Posted Aug 03, 2026 - 14:18 NZST
This scheduled maintenance affects: Backup Platforms (Online Backup (CommVault) - Fully Managed Backups, Online Snapshot Platform - Fully managed Shadow Protect backups, Veeam Cloud Connect (VCC) - Off Site Repository For Veeam Backups) and Data Centers (Christchurch SGS Data Centre).