Atturra will be conducting our 4 monthly ALDC generator load test. It is not envisaged that this test will affect customers, as the generator will supply power requirements during the test. Should the generator fail during the test period, UPS power will be provided while mains power is immediately restored.
Posted on
May 13, 2026 - 12:44 NZST
Atturra will be conducting our 4 monthly Omega generator load test. It is not envisaged that this test will affect customers, as the generator will supply power requirements during the test. Should the generator fail during the test period, UPS power will be provided while mains power is immediately restored.
Posted on
May 18, 2026 - 17:16 NZST
One of Atturra’s last mile carriers will be doing some network upgrades to improve performance and stability. During the outage window, there’ll be one ~50ms switching break and up to 5 hours loss of redundancy for protected circuits. Unprotected circuits may also experience up to 5 hours of service loss during the outage window.
Posted on
May 20, 2026 - 04:04 NZST