Planned Maintenance | CHG0031565 - Minor Change - Datacentre Services - Tawa DC Generator Load Test and UPS Preventative Maintenance - March 2026

Scheduled for Mar 21, 08:00 - 12:00 NZDT

Scheduled

Reference Number: CHG0031565

Affected Services: Datacentre Services

Maintenance Start Time: 21/03/2026 08:00:00 NZDT

Maintenance End Time: 21/03/2026 12:00:00 NZDT

Maintenance Duration: 4 Hours

Reason: Atturra will be conducting the Tawa Data Centre’s quarterly generator load test on Saturday the 21st of March between 8.00am and 12.00pm. In conjunction with this, we will be carrying out UPS maintenance.

Impact: It is not envisaged that this test will affect customers, as the generator will supply power requirements during the test. Should the generator fail during the test period, UPS power will be provided while mains power is immediately restored.

Contact: Please contact us on, 0800 266 846 option 2 | AMS-faults@atturra.com (quote your reference number)
Posted Mar 11, 2026 - 05:04 NZDT
This scheduled maintenance affects: Data Centers (Tawa Data Centre).